Saturday, May 16, 2015

Our Lot in Life

I used the term "our lot in life" in a radio conversation this morning at 5:15 am with a vessel following me out of Bottleneck Inlet where both of us had anchored for the night. In was in reference to the necessity for slow boats to start early in order to put in long miles in a day.

That phrase also describes all of the routing we've done since we made the second start to our 2015 cruise after having to return to our winter homeport to deal with our misbehaving electronic compass (it is working fine so far, by the way). The delayed start meant we missed our optimum timing at Seymour Narrows, an early morning slack before the ebb. We like to ride the building ebb down Johnstone Straits. That ebb will add a couple of knots to our normal sedate cruising speed of 6-7 knots.

The week delay meant the slack before the ebb was closer to mid-day. Unfortunately, the relatively stable high pressure ridge off the coast was generating afternoon NW winds of 15-25 knots. When those winds hits the ebb current in Johnstone, the waves build up and you have short steep waves combined with current eddies, an uncomfortable combination.

We chose the more protected channels through, Yuculta, Gilliard, Dent, Green and Whirlpool rapids, as the winds are generally less there. Unfortunately, all of those rapids require timing. We split them over two days, the first 3 on one day and the other 2 on the second day. The travels on the second day, lasting 14 hours, got split into 3 sections with brief interludes between the sections. That was so we could time Whirlpool and then later, Chatham Channel which got us into the Broughtons. It was just our lot in life to have to travel the slower route this year.

Since getting past those hurdles, our pace has quickened. The starts are still early but at least we’re racking up the miles and hope to be in Ketchikan (weather permitting) in a few days.

No comments:

Post a Comment